Jizan, October (پاکستان پوائنٹ نیوز 20 اكتوبر 2025ء) The project encompasses comprehensive infrastructure works, including the development of stormwater drainage systems, sewage networks, electrical lines, and the construction of an open channel for water drainage.
It also features the installation of modern sidewalks, advanced lighting systems, and high-quality asphalt designed to withstand harsh climatic conditions and heavy traffic loads to ensure long-term road durability and operational efficiency.
JCPDI's CEO Dr. Hussein Al-Fadhli recently signed a contract with a national company to supply and install sidewalks and road signage along the city's main roads.